Altana Mechanical Cupping Tester Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 18
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
16
English
Maintenance Schedule
Between tests
Clean the indenter and clamp system as
necessary.
Daily
Check the zero-datum as required.
Yearly
Have the instrument serviced and calibrated
by a trained and qualified service engineer
Cleaning
Do not use solvent to clean the instrument
(apart from the clamp system and indenter).
Painted surfaces may be cleaned with a slightly
damp cloth and mild detergent solution.
*Do NOT apply a large side-force to the spindle when cleaning it.
Maintenance
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18

Comentarios a estos manuales

Sin comentarios